Français
  • Home
  • What's New ?
  • Next Steps
  • Background
  • Related Links
  • Frequently Asked Questions
  • Public Consultation
  • Media Room
  • Resources
  • Contact Us

Funding Partners

Ontario

Technical Partners 

Ottawa

Gatineau  

Consultants

 

PCS 3 Reports


Prince of Wales Technical Memo
Ferry Coarse Screening Technical Memo
TSM Technical Memo
Macdonald Cartier Tunnel Technical Memo
Alternative Alignments Technical Memo  (Figures  1,2,3 (5.3 Mb), Figures 4, 5,6 (5.8 Mb), Figures 7,8,9  (6.1 Mb) )
Future 2031 Traffic Demand Projections Memo  ( Appendix A (5.6 Mb),  Appendix B,   Appendix C (7.9 Mb),  Appendix D (1.9 Mb))


Corridor Assessment of Existing Drainage Technical Memo
Fisheries Report (2.5 Mb)
Navigable Waters Technical Memo
Assessment of Traffic Demand Memo
Noise Effects on Horses
Potential Water Well Locations (3.9 Mb)
Noise Technical Memo(4.2 Mb)
Geotechnical Constraints Technical Memo - bridges
Geotechnical Constraints Technical Memo - tunnels  
Traffic Modelling and Forecast Trip Assignment
Economic Impact Report (28.8 Mb)
Land Use Ontario (9.9 Mb)
Land Use Quebec  (Appendix 1A (8.0 Mb), Appendix 1B (7.5 Mb), Appendix 2, Appendix 3)
Hydrotechnical Memo 
Analysis of Potential Transit Impacts (4.6 Mb)
Air Quality Memo (8.0 Mb)